Trussel - Case Study
Impact Hub Platform Requirements and Architecture Options - 2026
The situation
Trussell needed a data architecture and platform to bring finance, CRM and operational data together and to produce governed KPI reporting. However, when they engaged us, they were thinking about it from a product point of view, which carried significant risk of over-engineering. It had a fixed year-one budget covering platform, hosting and supplier services, and a mixed development model in which a supplier would build data ingestion and transformation while in-house staff took on the semantic and reporting layers. The question was what level of platform the organisation's needs actually justified, and which supplier proposals met it.
What AAW did
We shifted focus from products back to strategy and requirement. The platform requirements were specified across four dimensions being data, control, service and analytics, each prioritised as a must, should or could. Alongside them we defined a four-level architectural profile model, running from a foundational reporting platform up to a full data engineering platform, so the organisation could see what each level of sophistication would give it and what it would cost to operate. The target was set at level two, a governed and version-controlled data warehouse with the semantic layer held inside the warehouse itself. Candidate architectures on Microsoft Fabric, Amazon Web Services and Google Cloud were then described at each level and assessed against the same requirement set.
What it delivered
A technology-agnostic requirements specification that doubled as the supplier evaluation framework
The architectural profile model, which let the organisation position its own needs deliberately instead of accepting a supplier's level by default
An assessment of candidate technology stacks on a like-for-like basis, including build and run cost, the in-house skills each would require, and what each would make harder later
A clear view of whether the solution under consideration was proportionate to the requirements
This is the method set out under Technical Approach: requirements first, then options, each scored against the same criteria.
Facing a similar challenge?
Every organisation is different. Tell us what you’re working on and we’ll explore how we can support you.